diff options
author | Jozef Gloncak <jgloncak@cisco.com> | 2016-02-03 11:18:51 +0100 |
---|---|---|
committer | Dave Wallace <dwallacelf@gmail.com> | 2016-02-04 13:08:28 +0000 |
commit | 809e3e17a7582e56404c95e645914dd341fa379e (patch) | |
tree | 6be38cf505bd319d631fb8a87825beb1ddc96c0f /vbd/impl/vbridge-workflow.txt | |
parent | afb65be5ea2e05319bf4241856231a2a5d8646ca (diff) |
Adding termination point to VBD on VPP.
Creation request from UI for creating new termination point cause
that interface on VPP is added to virtual bridge domain.
Change-Id: I73910e31250c81e9e8baac40072926bdfc71ff22
Signed-off-by: Jozef Gloncak <jgloncak@cisco.com>
Diffstat (limited to 'vbd/impl/vbridge-workflow.txt')
-rw-r--r-- | vbd/impl/vbridge-workflow.txt | 10 |
1 files changed, 4 insertions, 6 deletions
diff --git a/vbd/impl/vbridge-workflow.txt b/vbd/impl/vbridge-workflow.txt index 86ba544f4..9f93e6fd4 100644 --- a/vbd/impl/vbridge-workflow.txt +++ b/vbd/impl/vbridge-workflow.txt @@ -32,7 +32,7 @@ Prerequisite: configured netconf-node-topology - bridge-member container - supporting-node pointing to the VPP node in the netconf-node-topology - + B) The Controller App receives a DataTreeChangeNotification about the node being added, and: @@ -46,7 +46,7 @@ Prerequisite: configured netconf-node-topology datastore. The leaf contains a RESTCONF-encoded instance identifier of the bridge domain created in the VPP, relative to that VPP's mount point. - + 3) Assigning a physical VPP interface into a Virtual Bridge Domain Prerequisite: The VPP itself has been added to the Virtual Bridge Domain @@ -54,9 +54,7 @@ Prerequisite: configured netconf-node-topology A) The UI creates a 'termination-point' inside the 'node' added in 2), with: - - user-interface, containing RESTCONF-encoded instance identifier - of the VPP interface, relative to that VPP's mount point in config - data store. + - interface name. B) The Controller App receives a notification of this being done and: - looks if the VPP is connected, if it is, the app will: @@ -64,7 +62,7 @@ Prerequisite: configured netconf-node-topology Inverse operations are achieved by the UI deleting the corresponding nodes in the Controller's configuration data store. - + Virtual Bridge Domain tunnel management --------------------------------------- |