Age | Commit message (Collapse) | Author | Files | Lines |
|
- update test suite numbering to be future-proof
- reorder suite execution:
- persistence suite should always run last
- l2_fib suite follows after l2
- VxLAN gpe suite follows after VxLAN
- fix issue with interface name vs. index introduced in change #1032
- change ${node} variable to global scope, set in _init_.robot
Change-Id: Ib4ca7265586026faab219da9923e7ca312ef2c79
Signed-off-by: selias <samelias@cisco.com>
|
|
- add new negative test for bridged-virtual-interface setting
- modify variables in original bd tests to use bvi=False
- separate interface ipv4 test case into netmask and prefix
- replace per-testcase tag definitions with per-suite forced tags
- add separate tag for persistence suite, due to it's long execution time
Change-Id: I79ae699125d4838ed8b394dc80a028e08b4de684
Signed-off-by: selias <samelias@cisco.com>
|
|
JIRA: CSIT-168
- add tests for Honeycomb L2 FIB support
- add keywords for Honeycomb L2 FIB support
- fix typos
Change-Id: I81292c10e26e7ad05725034c1db1db0a81d29283
Signed-off-by: Tibor Frank <tifrank@cisco.com>
|
|
- add new test cases based on reported bugs
- minor fixes
Change-Id: I8b7464bc1f4e786e3a0ef67ba64d81e1c25ae5cf
Signed-off-by: selias <samelias@cisco.com>
|
|
- fix interface assignment verification through VAT
- add verification of split horizon group setting through VAT
- clean up documentation of high level bridge domain keywords
Change-Id: I7552494d68c6bbc86d3e5ddea4e29c6a7444d50c
Signed-off-by: selias <samelias@cisco.com>
|
|
- move all Honeycomb related libraries written in python to new
directory resources/libraries/python/honeycomb
- update all related includes in all source files
Change-Id: Ifa96b8f670b456b14421929d6020ddf8e02d9cbc
Signed-off-by: Tibor Frank <tifrank@cisco.com>
|
|
JIRA: CSIT-41, CSIT-42, CSIT-43
- add test cases for Honecomb bridge domain management
- add keywords used by these tests
- prefix the names of Honeycomb test suites with numbers, so that they
execute in a specific order
- moved suite teardown with "Stop Honeycomb service" to bridge domain
suite
Note: Due to time constraints, the Honeycomb service cannot be restarted
between executions of individual Honeycomb test suites. Therefore
Honeycomb will be setup in the first test suite and shut down after the
last one.
Change-Id: I36b7f8335e5ba54985da5bd83730cf856d5ab48b
Signed-off-by: selias <samelias@cisco.com>
|