Age | Commit message (Collapse) | Author | Files | Lines |
|
This test setup and teardown is aimed to be used with all functional
tests.
It does not include functionality to manipulate VMs (qemu).
Test setup includes:
- Setup all DUTs before test
- Save VPP PIDs
- Setup all TGs before traffic script
- Update All Interface Data On All Nodes
Test teardown includes:
- Show Packet Trace on All DUTs
- Show vpp trace dump on all DUTs
- Vpp Show Errors On All DUTs
- Check VPP PID in Teardown
Change-Id: Ifee0bd58b7865442c5b510852908fd8363e3c543
Signed-off-by: Tibor Frank <tifrank@cisco.com>
|
|
- add gre test with multiple tunnel configured
- configure tunnel source as a loopback
- route from tunnel to tunnel
- check droping unknown tunnel destination
Change-Id: Ib522d158d9de5c66f556c6734ceadc994eea02d4
Signed-off-by: Matej Klotton <mklotton@cisco.com>
|
|
- Move performance directory one level up and rename it to “perf”
- Rename “suites” directory to “func”
- Create __init__.py in “perf” directory
- Rename fds_related_tests to fds
Change-Id: I59f06afe1c5b95dd8a48417b8fbfd1fca8797097
Signed-off-by: Matej Klotton <mklotton@cisco.com>
|