|
This test setup and teardown is aimed to be used with all functional
tests.
It does not include functionality to manipulate VMs (qemu).
Test setup includes:
- Setup all DUTs before test
- Save VPP PIDs
- Setup all TGs before traffic script
- Update All Interface Data On All Nodes
Test teardown includes:
- Show Packet Trace on All DUTs
- Show vpp trace dump on all DUTs
- Vpp Show Errors On All DUTs
- Check VPP PID in Teardown
Change-Id: Ifee0bd58b7865442c5b510852908fd8363e3c543
Signed-off-by: Tibor Frank <tifrank@cisco.com>
|