Age | Commit message (Collapse) | Author | Files | Lines |
|
Causes static analysis "vulnerability" warnings
Type: fix
Ticket: VPP-1837
Signed-off-by: Dave Barach <dave@barachs.net>
Change-Id: I272fa69251d70f62178e6dff0423c16f99937af1
|
|
Along with related static analysis warnings...
Type: fix
Ticket: VPP-1837
Signed-off-by: Dave Barach <dave@barachs.net>
Change-Id: I2c6949c7a2250b8f76a63508c7c210daecfe0f91
|
|
Many missing "extern" declarations, it's hard to imagine why the
related compile/link errors just showed up.
Type: fix
Change-Id: I0878bf5fdb10ffdd8e0c49c9e5153cddaf3bc1fd
Signed-off-by: Dave Barach <dave@barachs.net>
|
|
Change-Id: I53ab8d17914e6563110354e4052109ac02bf8f3b
Signed-off-by: Paul Vinciguerra <pvinci@vinciconsulting.com>
|
|
Shows up on the status line.
Change-Id: I14635f7406069a4a868bdb7c8b85da941c49dbba
Signed-off-by: Dave Barach <dave@barachs.net>
|
|
Compute per-track mean, variance, and n*stddev stats for the first u32
datum in each instance of the supplied event.
Search for the next instance of the indicated event which has a datum
larger than mean + n*stddev.
This turns out to be a very effective "Nixon Gap" finder when the
selected event datum is the instantaneous vector size. Such traces can
be easily captured from production vpp images.
Change-Id: I876843cb2ece22f902720704ce4568d4e1173e01
Signed-off-by: Dave Barach <dave@barachs.net>
|
|
Change-Id: Ied34720ca5a6e6e717eea4e86003e854031b6eab
Signed-off-by: Dave Barach <dave@barachs.net>
|
|
Change-Id: I901c5a2c0ac81421a69b8ade9307c304aa38582b
Signed-off-by: Damjan Marion <damarion@cisco.com>
|
|
Change-Id: Ib3e25916c66fa3e1b082359095652c45d3b27d0f
Signed-off-by: Dave Barach <dave@barachs.net>
|
|
Change-Id: Ibc293aa1305126920c0b2c44df1f7a7d5ae9ea9d
Signed-off-by: Dave Barach <dave@barachs.net>
|
|
Create an elog_merge utility, extracted from test_elog.
Change-Id: Ide137b4858c88b3a2885583b7fbb15ddc4963af9
Signed-off-by: Dave Barach <dave@barachs.net>
|
|
Fix a decade-old ridiculous qsort function bug. Managed to subtract
floating-point numbers as if they were integers, leading to
manufactured time-paradoxes. That completely confuses g2, leading to
the summary disappearance of entire tracks' worth of data at high zoom
levels.
Add a manual alignment tweak parameter to elog_merge, users can
dial-out time paradoxes caused by NTP-grade clock synchronization.
The event-logger has a precision of O(100ns), whereas NTP
synchronization is O(1ms).
Change-Id: I69dedabaa314f69f9df74ec9ee66e21e6c87f703
Signed-off-by: Dave Barach <dave@barachs.net>
|
|
Change-Id: I7d7748c9c44132d033a9aff1687112ffcb44c460
Signed-off-by: Dave Barach <dbarach@cisco.com>
|
|
Change-Id: I1c3b87e886603678368428ae56a6bd3327cbc90d
Signed-off-by: Damjan Marion <damarion@cisco.com>
|
|
Change-Id: I7b51f88292e057c6443b12224486f2d0c9f8ae23
Signed-off-by: Damjan Marion <damarion@cisco.com>
|