aboutsummaryrefslogtreecommitdiffstats
diff options
context:
space:
mode:
-rw-r--r--docs/gettingstarted/developers/fib20/tunnels.rst2
1 files changed, 1 insertions, 1 deletions
diff --git a/docs/gettingstarted/developers/fib20/tunnels.rst b/docs/gettingstarted/developers/fib20/tunnels.rst
index c33d63c3b92..c96b1337d4e 100644
--- a/docs/gettingstarted/developers/fib20/tunnels.rst
+++ b/docs/gettingstarted/developers/fib20/tunnels.rst
@@ -10,7 +10,7 @@ beforehand, so the recursive switch can be avoided if the packet can follow the
already constructed data-plane graph for the tunnel's destination. This process
of joining to DP graphs together is termed *stacking*.
-.. figure:: /_images/fib20fig2.png
+.. figure:: /_images/fib20fig11.png
Figure 11: Tunnel control plane object diagram